Gap between the end of the ledger and the ends of siding and fill it with high quality exterior caulk to keep water from leaking behind the ends of the ledger.
Deck ledger attached to siding.
Then slip flashing behind the siding covering the top edge of the ledger.
Cut siding and flash.
Anchor deck joists to the ledger with joist hangers filling each hole with galvanized joist hanger nails rated for pressure treated wood.
Deck ledger board installing a deck ledger board around vents pipes and spigots.
Of the 7 in.
The proper use of waterproofing flashing is also integral to the structural soundness of an attached deck.
This leaves only 4 in.
Never install a ledger board over the top of siding no matter what you hear this can weaken the connection.
Air space between the decking surface and bottom of the siding course.
How do you install a deck ledger board around vents pipes and spigots.
Snap a chalk line cut out the siding and tack up the ledger board.
Use a nail as a temporary place holder to check the ledger to see if it s leveled.
Start by making an outline on the siding where you want to position the ledger board.
Aluminum and vinyl siding can easily be removed with tin snips from an area one foot surrounding the ledger board location.
Thick and some siding types require there be a 2 in.
Attaching a deck ledger securely is only half the work of installing a ledger.
Step 3 add 2 x 8 planks between joists.
Slide the flashing underneath the siding 1 inch.
Carefully cut away the siding with a utility knife braced along the edge of the carpenter s square to avoid slicing through the house wrap.
Measure the length and width of your deck to attach the ledger correctly.
The decking is usually 1 in.
Overlap flashing by 3 inches and cut it for the doorway.
In order to install the ledger board you usually need to remove the house s siding.
First ensure your circular saw is equal to the thickness of the deck then cut the ledger outline.
Step 2 cut away the vinyl siding.
We offer two solutions that can solve your problem.