Then slip flashing behind the siding covering the top edge of the ledger.
Deck ledger installed over siding.
Set a water level on mark done for the ledger board then make another at a point longer than.
Cut back the siding above the ledger in two places right at the top of the ledger and 1 above the level of the board that goes over the ledger.
Make a mark where the top of the deck should be the mark should be 1 3 inches below that.
It might have choked artie but it ain t gone a choke stymie.
If you re just trying to buy a few years until a new deck can be built some tubes of high quality silicone caulk and whatever other tricks it takes to divert water to the face of the ledger can buy you some time.
Make the outline large enough to include space for the deck boards on top the ledger and any trim boards on the sides.
Snap a chalk line cut out the siding and tack up the ledger board.
Ledger may not be installed over siding or stucco.
How to attach ledger board on siding mark the top of the ledger.
Loosen the siding left above the ledger so that you can slip flashing under the paper under the siding.
You can then trim the pieces to be reinstalled with a j channel after the deck is completed for a clean finished look.
Aluminum and vinyl siding can easily be removed with tin snips from an area one foot surrounding the ledger board location.
Properly installing a ledger board for your deck is one of the most important structural components of building a safe and strong deck.
Never install a ledger board over the top of siding no matter what you hear this can weaken the connection.
Our gang the pooch 1932.
After the ledger is installed a second strip of membrane tape is applied over the top of the ledger and about 1 2 in.
Run flashing behind the siding and over the ledger as should have been done in the first place.
These 18 articles will teach you how to install flashing and bolt the ledger connection to the house rim.
Though it will take some dismantling and perhaps a replacement deck board or stick of siding following the recommended practices for installed ledger flashing based on your exterior cladding is the best approach.
This may seem excessively tall but is needed in order for the water resistive barrier wrb and siding to overlap the top.
The wall leg is at least 7 in.
It must be fastened directly to the rim joist or stud or through sheathing into an appropriate framing member.
Attach a deck can be used to mount ledgers on new homes and retrofit decks over siding on existing homes the system is tested by an engineering service the installation is simple and fast lag screws can be used something the 2009 prescriptive ledger mounting table only permits for bolted ledgers.