Curtain wall systems www kawneer co uk 11 aa 110 65mm curtain wall system aa 110 65mm introduction the aa 110 65mm curtain wall system is designed as a stick frame assembly with weather performance achieved by drainage and ventilation of the glazing rebates.
It is a semi unitised zone drained and pressure equalized system and offers a slim 50mm sightline with a choice of three mullion and four transom depths.
Second floor stick curtain wall system 1 second fl 12 0 roof 0 angle bolt glass insulation mullion water proofing flashing rigid slab insulation.
Wall section 04 112 1 on outer on d rained at ve inner on precast the air at onts sealant at precast n t meta pin to t stud cast in back edge to ot.
A curtain wall system is an outer covering of a building in which the outer walls are non structural utilized only to keep the weather out and the occupants in.
Drainage and ventilation is achieved via the mullion on mullion drained or.
Scw curtain wall has been designed to meet current building regulations.
The system is capable of being fabricated into ladders for quick assembly on site and of accepting.
Dec 5 2016 explore ag studio design s board wall detail section on pinterest.
Where fire resistance rated floor or floor ceiling assemblies are required voids created at the intersection of the exterior curtain wall assemblies and such floor assemblies shall be sealed with an approved system to prevent the interior spread of fire.
See more ideas about architecture details construction drawings architectural section.
Place the completed curtain rod on the floor against the wall directly below where you wish to install it.
Since the curtain wall is non structural it can be made of lightweight materials thereby reducing construction costs.
When glass is used as the curtain wall an advantage is that natural light can penetrate deeper within the building.
Get these project files and all advanced 1h courses.
Curtain wall systems must transfer back to floor structure or intermediate framing both their own dead load plus any live loads which consist primarily of positive and negative wind loads but might also include a snow load applied to large horizontal areas seismic loads maintenance loads and others.